Projects that speak for themselves.
Selection of completed apartment and bathroom refurbishments, flooring and drywall work in Munich.
Full attic renovation
Loft-style build-out with skylights, new floor build-up and oak parquet, drywall and painting — handover in 8 weeks.
- Area60 m²
- Build time5 Wochen
- DistrictDachgeschoss
- AfterBeforeBathroomBefore / After
Bathroom with walk-in shower
Full modernization: old tub and wall tiles removed, new walk-in shower, large-format tiles, illuminated wood-look vanity.
Munich-Bogenhausen
- AfterBeforeFlooringBefore / After
Vinyl flooring in wood look instead of tiles
Old grey tiles removed, substrate prepared, warm vinyl oak planks installed — completely new room character.
Munich-Haidhausen
DrywallDrywall for commercial space
Large-scale drywall with Q3 plaster, door openings and internal windows — ready for painting and final fit-out.
Munich-Werksviertel
- AfterBeforeRenovationBefore / After
Bar with wood slats and vinyl floor
Curved design bar with indirect LED lighting and oak-look vinyl flooring on a prepared substrate.
STC – Siemens Tennis Klub Munich
BathroomBathroom pre-wall and plumbing
Drywall pre-wall with prepared connections for shower, WC and sink — basis for tiling work.
Munich-Sendling
RenovationTV wall with marble and LED
Custom TV wall with marble-look panel, indirect LED backlight and floating cabinet over oak parquet.
Munich-Bogenhausen
- AfterBeforeRenovationBefore / After
Full kitchen renovation
Open kitchen in Altbau: all connections renewed, white high-gloss fronts combined with wood worktop, breakfast bar in solid oak.
Munich-Schwabing
ElectricalDistribution board installation
New electrical distribution board with Hager breakers, clean wiring rows and network/communication modules.
Munich-Pasing
